A grid-tied solar station is designed to earn profit under the green tariff, save consumed electricity, and smooth peak loads.

How this system works:

Electricity generated by the photovoltaic modules supplies the household's own consumption. When the generation power of the solar station exceeds the household consumption, the excess energy is "given" to the general power grid, and when the system's generation is insufficient, the missing energy is consumed from the general power grid. Payment under the "green" tariff is made at the end of each month for the excess generated electricity (that is, for the positive difference between the station's generation reading and the household consumption).

A feature of this type of photovoltaic stations is that the system operates only when there is voltage in the external power grid.

System configuration:

No

Equipment

Quantity

1

Solar panel Jinko solar 405W, monocrystalline

50

pcs

2

Grid-tied inverter Fronius Symo 20.0-3-M

1

pcs

3

Mounting system for pitched surface

1

pcs

4

Consumables

1

set

5

Cable for solar panels

300

m

6

Protective automation kit

1

set

7

Installation

Total with installation:

15 060 $

-

solar panels are manufactured by companies from the TOP-10 world leaders in production, inverter equipment — from TOP-5 companies;

-

this system configuration is basic and may be modified for specific conditions;

-

for sites outside Kyiv region the cost of equipment delivery is additionally taken into account;

-
free support when arranging the "green" tariff.

Area required for installing the solar station:

Layout of the grid solar station:

System performance:

Annual electricity production from the station during one year of operation will be 21 000 - 21 700 kWh.

  • Production in real conditions depends on actual meteorological conditions and may differ by ±15%;

** Data are provided for the central regions of Ukraine.

Economic effect:

The amount of capital investment for equipment will be 15 060 $.

On average a grid station with a capacity of 20 kW produces about 21.7 MWh of electricity per year of operation.

The price of one kilowatt under the “green” tariff is 0.164 €, for 1 year of operation the station will bring 3 500 $ after taxes provided that all generated electricity is sold.

The payback period of the station will be 3.5 years with minimal self-consumption.

Read more

Published on 2026/10/11

Description

A grid-tied solar station is designed to earn profit under the green tariff, save consumed electricity, and smooth peak loads.

How this system works:

Electricity generated by the photovoltaic modules supplies the household's own consumption. When the generation power of the solar station exceeds the household consumption, the excess energy is "given" to the general power grid, and when the system's generation is insufficient, the missing energy is consumed from the general power grid. Payment under the "green" tariff is made at the end of each month for the excess generated electricity (that is, for the positive difference between the station's generation reading and the household consumption).

A feature of this type of photovoltaic stations is that the system operates only when there is voltage in the external power grid.

System configuration:

No

Equipment

Quantity

1

Solar panel Jinko solar 405W, monocrystalline

50

pcs

2

Grid-tied inverter Fronius Symo 20.0-3-M

1

pcs

3

Mounting system for pitched surface

1

pcs

4

Consumables

1

set

5

Cable for solar panels

300

m

6

Protective automation kit

1

set

7

Installation

Total with installation:

15 060 $

-

solar panels are manufactured by companies from the TOP-10 world leaders in production, inverter equipment — from TOP-5 companies;

-

this system configuration is basic and may be modified for specific conditions;

-

for sites outside Kyiv region the cost of equipment delivery is additionally taken into account;

-
free support when arranging the "green" tariff.

Area required for installing the solar station:

Layout of the grid solar station:

System performance:

Annual electricity production from the station during one year of operation will be 21 000 - 21 700 kWh.

  • Production in real conditions depends on actual meteorological conditions and may differ by ±15%;

** Data are provided for the central regions of Ukraine.

Economic effect:

The amount of capital investment for equipment will be 15 060 $.

On average a grid station with a capacity of 20 kW produces about 21.7 MWh of electricity per year of operation.

The price of one kilowatt under the “green” tariff is 0.164 €, for 1 year of operation the station will bring 3 500 $ after taxes provided that all generated electricity is sold.

The payback period of the station will be 3.5 years with minimal self-consumption.

    Attributes
Related listings in your area
How far is it? Show listings in my area
Show only listings that are km distanced Show listings

Contact the seller

User is offline
  • 538 active listings
  • Company
  • Registered for Sunday
  • Київ, Київська область, Україна
Call